ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

Identify the relationship between the size of the dna and the structure of the agar gel that explains why dna moves the way it does in the gel electrophoresis.
Which brand velocity group sports advisory board member is the former executive director of the national basketball players association?.
Which of the provides a cloud-based platform for running websites and databases and executing programming languages?.
In one to two sentences, identify and describe the processes that must happen for sand to eventually become metamorphic rock.
Show or explain why 0.5% is not equal to 1/2
a 30 year man sustains a left femoral fracture in a skiing accident, and his leg is placed in a cast. after several weeks of immobilization, you find that the l
what is the answer to 252 divided by 36
Why did the Elizabethans believe social class and status were important?
With respect to prayer in public schools, the united states supreme court has ruled that.
A fair ten-sided dice has faces numbered 1-10. the dice is rolled five times. a) on each roll, how many ways are there to roll a multiple of 3? b) how many diff