carlos907030 carlos907030
  • 01-08-2017
  • Mathematics
contestada

if structural steel installed in 2.75 floors of a building 2 3/8 day , how long will it take to install steel in 11 floors

Respuesta :

gentlebiker
gentlebiker gentlebiker
  • 01-08-2017
I will take 9.5 days, to install steel in 11 floors.
Answer Link

Otras preguntas

The United Nations only uses troops and trade embargoes to back the Declaration of Human Rights
The figure below shows parallel lines cut by a transversal: A pair of parallel lines is shown with arrowheads on each end. A transversal cuts these two lines. A
a regulation softball has a circumference of 12 inches. what is the volume of the softball?
Bloody sunday served as a turning point in russia because a. it marked the beginning of world war i. b. it strengthened the tsar’s power. c. it caused the pe
How new species may have formed in three land masses from the ancestral Adansonia species
where should raw meat be placed in refrigerator
(08.01 MC) Read the sentence and decide if the bolded word is a borrowed word, a cognate, a false cognate or an idiomatic expression. L'hôtesse de l'air travail
To provide a worker protection from exposure to hazards, the recommended first choice is to utilize _________. a. ppe. b. engineering controls. c. heavy equipme
what is 0.16, 6 repeating as a fraction?
72in^2= ft^2find the blank