leila839 leila839
  • 03-02-2021
  • Mathematics
contestada

Q11.
It takes 3 painters 2 days to complete a job. Work out how long 1 painter would take.

Respuesta :

26liujiaying
26liujiaying 26liujiaying
  • 03-02-2021

Answer:

6

Step-by-step explanation:

1 painter is 1/3 of 3 painters, so the answer is 2 x 3=6

Hope I helped!

Answer Link

Otras preguntas

write the following decimals as fractions. Give your answer in its simplest form. a) 0.6= b) 0.025
if the weight of a package is multiplied by 5/7 the result is 40.5 pounds. Find the weight of the package.
a box of powdered laundry detergent contains 5.2 ounces of detergent. it takes 0.7 ounce of detergent to clean a load of laundry. how many full loads can be cle
If a car is towed 12 miles to the repair shop and the tow charge is 3.50 per mile how much does the tow cost
write the following decimals as fractions. Give your answer in its simplest form. a) 0.6= b) 0.025
What is the best way to classify each equation? Column A Column B 1. 5x - 20 = 2(3x - 10) a.identity b.contradiction c.neither 2. 4x - 16 - 2x = 2(x - 8) 3. 6x
When a newly formed cell enters into interphase and begins conducting metabolic functions, it is in _____.
Why was reconstruction of the south likely to be a difficult process?
All hypothesis contain three things
A scientist measures the pH of some rainwater and finds that it is acidic. Which pH corresponds with the acidic quality of the rainwater? A. 6 B. 7 C. 8 D.