kimbrachantel2962 kimbrachantel2962
  • 03-03-2020
  • Computers and Technology
contestada

The transition from ____ is initiated by the Job Scheduler according to some predefined policy. At this point, the availability of enough main memory and any requested devices is checked.

Respuesta :

isaacoranseola
isaacoranseola isaacoranseola
  • 04-03-2020

Answer: Hold to ready

Explanation:

This is when the process is waiting to be assigned to a processor. And this is carried out by the short term scheduler, so it can run. This state is immediately after the new state for the process.

Answer Link

Otras preguntas

Can you prove the prove the moon has gravity
Can someone please give me an example of a displacement reaction using an ionic equation ??
find the sum 1.685+8.5=
Describe what you would do to prepare 100.0g of a 3.5% solution of ammonium sulfate in water.
You plan to construct a brick wall measuring 15 ft in length, 6 ft high, and 1 ft in width. if a brick measures 6 in x 4 in x 2 in, how many bricks will you nee
What was the first thing hayes did as republican president of the united states??
2x+5y=60 2x-5y=-20 Please show work!
The length of a rectangle is 45 in and is dilated to 15 in. What is the scale factor? 1/3 3 -3 - 1/3
What protects living things from too much ultraviolets radiation?
Jacques deposited $1,900 into an account that earns 4% interest compounded semiannually. After t years, Jacques has $3,875.79 in the account. Assuming he made n