​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

The moon appears larger in the sky during _____.
Help me answer these please.......
In contrast to traits, "states" are a. basic tendencies that define the core potential of a person. b. enduring response patterns that an individual exhibits in
why is it important to use a democratic method of choosing someone for a position of authority
Mass spectrometry demonstrated that a bacterial protein and one section of a eukaryotic protein had amino acid sequences that were 90% similar. what else is lik
find the value of y.
a food production that has to be imported into a country for that country’s consumption most often becomes
A chemist has 5 l of a solution that contains 0.25 l of acetic acid. the chemist needs to prepare 9 l of a solution with the same percent concentration of aceti
How do I express 1/2 of the difference of a number cubed and one?
Can some one help me with this question.