It takes 10 workers 24 hours to do a job.
Fill in the chart.

It takes 10 workers 24 hours to do a job Fill in the chart class=

Respuesta :

biggersis1968p8xgn0 biggersis1968p8xgn0
  • 02-06-2018
5 in 48 
10 in 24
20 in16
30 in12
40 in 8
50 in 4
Answer Link

Otras preguntas

Use the slope formula to find the missing coordinate. R(0, _), S(-4, 2) m = 5 a. 18 b. 22 c. -22
To halt the decline in biodiversity, we must do which of the following?
Jan buys 5 yards of blue fabric then she buys 2 feet of red fabric and 4 feet of green fabric how many inches of fabric does Jan have altogether
What is the factorization of 216 times 12 - 64?
what is the purpose of the enclosed seeds in fruit found on a flowering plant
a .35 m solution of weak acid, HX, has a h+ of 4.15×10^-3. what is the value of ka for this acid
which of the following sentences is correct?A.a clause is a group of related words,but a phrase is not. B.a clause has a subject and a verb,but a phrase does no
Lee needed to make drapes the length from the floor to the top of the window. The wall beneath the window had the height of 2 2/3 feet and the height of just th
The last two lines in a Shakespearean sonnet are always
What parts of atoms are responsible for how they interact with other atoms